When I was called to lead the endline survey for a multi-country agricultural evaluation, the work looked straightforward on paper. There was an existing baseline, a sample frame of project participants, and a clear plan of action.
But when we received the list of farmers to sample the picture changed significantly. The project had nearly doubled the number of active farmers since baseline. Interventions had also changed, with new activities added and existing ones adjusted since the original design. This created a dilemma for the endline design. Surveying only baseline farmers would miss the thousands who had joined after the baseline and fail to cover the full range of intervention effects. Surveying only new farmers would lose the analytical power of direct before-and-after comparisons. And tracking every original respondent across two rural districts, within budget and on deadline, simply wasn’t feasible.
We needed something that could cover all bases. Fortunately, both the client and evaluation design gave us the flexibility to be creative.
The final sample was a hybrid: 40% drawn from active baseline farmers, 60% a fresh random sample from the current population. The hybrid approach gave us depth for direct trajectory analysis while ensuring the broader sample captured the project as it actually operates today.
While the statistics were a little complex, the underlying concept landed quickly: a creative and robust solution designed around what the evaluation actually needed. The fieldwork went smoothly, we hit our targets across all groups, and the data generated useful findings that fed directly into the final report.
The point here is that implementation and evaluation rarely go exactly as planned. Populations change, projects evolve, and gaps in data can emerge. Our job as evaluators isn’t to pretend otherwise, it’s to make defensible decisions under real constraints, document them clearly, and be honest about what the evidence can and cannot show.